Limmat TowerZurich



3D Composite Material for Facades

Ecolite Systems

Primary substructure:
System V

Secondary substructure:
UB System

Challenge

The client wants large-format, voluminous, three-dimensional elements made of ALUCOBOND® that form both horizontally oriented breastwork elements and standing columns. The substructure must be designed to prevent thermal bridging. Space available around the construction site is very limited.


Solution

To ensure smooth logistics, the elements are shipped to the construction site flat, and folded and prefabricated braces made from aluminium profiles are first glued and riveted on site. Costly transportation and all kinds of shipping damage are thus eliminated. The complete elements can be stored on site and then transferred to the installation team.


Ecolite Systems in Use

  • Primary Substructure
    Primary substructure consisting of Thermo H, Thermo Vbrackets , and angle profiles


  • System UB secondary substructure: 17 mm support profile and a continuous FS clip-on profile attached to the facade elements’ bonded transoms

 
 