The Challenge

Vertical extension to almost 30 m with installation of photovoltaic panels, on an area of 1210 square metres. The modules are to be inclined and arranged differently. The aim is to create a sequin effect that allows the building to be experienced differently depending on the daylight.

 

The Ecolite Solution

Thanks to early communication, decisive changes could be made to the steel construction. These made an optimal primary profile grid possible in the first place. The inclination of the modules is achieved by special pre-assembled brackets in the factory. The support profile pieces were then fixed to the brackets on site so that the modules could finally be accommodated by means of pre-assembled agraffes on the panel side.

 

Ecolite Products

These Ecolite products were used:

Special rectangular tubes, Omega profiles with pre-assembled solar consoles, and the GH system.

 